Due to unforeseen penetrations that were required to accommodate kitchen equipment and operations at the newly built Dean & Deluca building, there was an inadequate flexural capacity on its slabs.

The versatility of the Tyfo® Fibrwrap® systems allowed engineers and construction crews to design and work around the penetrations and provide the required positive and negative flexural enhancement as determined by J.S. Dryer & Associates Structural Engineers.

Fibrwrap Construction installed the carbon-based uni-directional Tyfo® SCH-41 system on the top and bottom of the slab in multiple locations and provided a Tyfo® RR finish to match the existing concrete slab.